© 2008 – 2016  |  Bartos Architecture, Inc.

 

 

1730 S. Amphlett Boulevard, Suite 225 | San Mateo, CA 94402 | 650-340-1221

* col-lab-o-rate

 

verb \kə- ‘la-bə – ə -.rāt\intransitive verb

~to work jointly with others or together especially in an intellectual endeavor.

~to cooperate with an agency or instrumentality with which one is not immediately connected.

PROGRAM AND CONSTRUCTION MANAGEMENT

Collaboration

We collaborate with our clients, consultants and colleagues.

Advocacy

We advocate for the public, our clients, and the profession of Architecture.

Research

We research in support of design. We believe that the best designs are discovered.

Education

We educate our clients, the community, our profession, …and ourselves.

Sustainability

We make sustainability an integral a part of our practice.

Project Bidding

 

Optional Pre-Proposal Site Tour

Contractors are welcomed to attend an optional site tour:

 

Monday, April 15, 2019 |  7:00 AM

Mission Hill Middle School

(at site address addresses above)

Proposals Due

Thursday April 25, 2019 | 2:00 PM

Bids Due at Facilities

536 Palm street, Santa Cruz


Anticipated Construction Schedule

June 10, 2019- July 15, 2019

Site Address

Mission Hill Middle School

425 King Street

Santa Cruz, CA 95060

 

 

District Address

Facilities Services

536 Palm Street

Santa Cruz, CA 95060

 

• Bid Advertisement

• Bid Drawing Set

• Project Manual

Addenda

•  Addendum 1

•  Addendum 2

•  Addendum 3

Downloadable Docs

The Project generally consists of ‘Installation of Permanent Walls’ in several classrooms at the Main Building of Mission Hill Middle School.

The extent of work includes but is not limited to:  The demolition of existing operable partition walls at various locations; remove and reinstall existing suspended acoustical ceiling tile; repair existing gypsum wallboard as necessary; new stud walls with gypsum wallboard and wood paneling, new marker boards, new flat panel TV’s with adjustable mount, new electrical outlets, new conduits and junction boxes for future data and cable wiring (data and cable wiring are not part of scope).

General Information

Contact Bartos Architecture for all project communications

Scope

Refer to project documents for detailed info

Mission Hill Middle School  Permanent Walls Project  |  Santa Cruz City Schools

 

Schedule

Architect

Bartos Architecture, Inc

1730 S. Amphlett Blvd, Suite 225

Tel: (650) 340-1221

• Bid Results

 

Project Announcements