1730 S. Amphlett Boulevard, Suite 225 | San Mateo, CA 94402 | 650-340-1221

* col-lab-o-rate

 

verb \kə- ‘la-bə – ə -.rāt\intransitive verb

~to work jointly with others or together especially in an intellectual endeavor.

~to cooperate with an agency or instrumentality with which one is not immediately connected.

PROGRAM AND CONSTRUCTION MANAGEMENT

Collaboration

We collaborate with our clients, consultants and colleagues.

Advocacy

We advocate for the public, our clients, and the profession of Architecture.

Research

We research in support of design. We believe that the best designs are discovered.

Education

We educate our clients, the community, our profession, …and ourselves.

Sustainability

We make sustainability an integral a part of our practice.

Project Bidding

 

Mandatory Pre-Proposal Site Tour

Contractors must attend a mandatory site tour:

 

Thursday, March 29, 2018 | 3:00 PM

Santa Cruz High School  Front Entry

(at site address addresses above)

Proposals Due

Tuesday, April 10, 2018 | 1:00 PM
536 Palm Street, Santa Cruz, CA 95060

Anticipated Construction Schedule
June 8, 2018- August 3, 2018

Site Addresses

Santa Cruz High School

415 Walnut Avenue

Santa Cruz, CA 95060

District Address

Facilities Services

536 Palm Street

Santa Cruz, CA 95060

 

Bid Advertisement

Project Drawings & Project Manual

Drawing Set

Project Manual

Addenda

 

 

Downloadable Docs

The extent of work includes but is not limited to:

General Information

Contact Bartos Architecture for all project communications

Scope

Refer to project documents for detailed info

Santa Cruz High School Domestic Water Piping Replacement Project  |  Santa Cruz City Schools

 

Schedule

Architect

Bartos Architecture, Inc

1730 S. Amphlett Blvd, Suite 225

Tel: (650) 340-1221

• Bid Walk Sign-in Sheet

Project Announcements