© 2008 – 2020  |  Bartos Architecture, Inc.

 

 

1730 S. Amphlett Boulevard, Suite 225 | San Mateo, CA 94402 | 650-340-1221

* col-lab-o-rate

 

verb \kə- ‘la-bə – ə -.rāt\intransitive verb

~to work jointly with others or together especially in an intellectual endeavor.

~to cooperate with an agency or instrumentality with which one is not immediately connected.

PROGRAM AND CONSTRUCTION MANAGEMENT

Collaboration

We collaborate with our clients, consultants and colleagues.

Advocacy

We advocate for the public, our clients, and the profession of Architecture.

Research

We research in support of design. We believe that the best designs are discovered.

Education

We educate our clients, the community, our profession, …and ourselves.

Sustainability

We make sustainability an integral a part of our practice.

• Santa Cruz City Schools Maintenance and Operations Page

• Bid Walk Sign-in Sheet

• Preliminary Bid Results

• Bid Results - S&H Construction

• Bid Results - Satellite Painting

• Bid Results - Fresh Start Painting Company

• Bid Results - D&T Painting

• Bid Results - Color New

• Bid Results - GDL Painters, Inc.

• Bid Results - Athens Painting and Commercial

• Bid Results - HB Restoration Inc

Project Bidding

 

Mandatory Pre-Proposal Site Tour

Contractors must attend a mandatory site tour:

 

Tuesday, March 9, 2021 | 10:00 AM

Westlake Elementary School

(at site address shown above)

Bid Question Deadline

Thursday, March 18, 2021 |  10:00AM

Addenda Deadline

Monday, March 22, 2021 | 10:00AM

Proposals Due

Thursday, March 25, 2021|11:30 AM

Bids Due at Facilities

536 Palm Street, Santa Cruz


Anticipated Construction Schedule

May 3, 2021- July 23, 2021



Site Address

Westlake Elementary School

1000 High Street

Santa Cruz, CA 95060

 

District Address

Facilities Services

536 Palm Street

Santa Cruz, CA 95060

 

• Bid Advertisement

• Bid Drawing Set

• Project Manual

Addenda

• Addendum 1

• Addendum 2

Downloadable Docs

The extent of work includes but is not limited to: Exterior Painting at Westlake Elementary School

General Information

Contact Bartos Architecture for all project communications

Scope

Refer to project documents for detailed info

Westlake Elementary School Exterior Painting Project  |  Santa Cruz City Schools

 

Schedule

Architect

Bartos Architecture, Inc

1730 S. Amphlett Blvd, Suite 225

Tel: (650) 340-1221

Project Announcements