© 2008 – 2016  |  Bartos Architecture, Inc.

 

 

1730 S. Amphlett Boulevard, Suite 225 | San Mateo, CA 94402 | 650-340-1221

* col-lab-o-rate

 

verb \kə- ‘la-bə – ə -.rāt\intransitive verb

~to work jointly with others or together especially in an intellectual endeavor.

~to cooperate with an agency or instrumentality with which one is not immediately connected.

PROGRAM AND CONSTRUCTION MANAGEMENT

Collaboration

We collaborate with our clients, consultants and colleagues.

Advocacy

We advocate for the public, our clients, and the profession of Architecture.

Research

We research in support of design. We believe that the best designs are discovered.

Education

We educate our clients, the community, our profession, …and ourselves.

Sustainability

We make sustainability an integral a part of our practice.

Project Bidding

 

Mandatory Pre-Proposal Site Tour

Contractors must attend a mandatory site tour:

 

Thursday, April 11, 2019 | 11:30 AM

Westlake Elementary School

(at site address addresses above)

 

Proposals Due

Thursday April 25, 2019 | 10:30 AM

Bids Due at Facilities

536 Palm street, Santa Cruz


Anticipated Construction Schedule

June 07, 2019- August 16, 2019

(Revised Date- Addendum 1)



Site Address

1000 High Street

Santa Cruz, CA 95060

 

District Address

Facilities Services

536 Palm Street

Santa Cruz, CA 95060

 

• Bid Advertisement

• Bid Drawing Set

• Project Manual

Addenda

• Addendum 1

• Addendum 2

• Addendum 3

Downloadable Docs

The Project generally consists of ‘Roof Replacement’ of the upper and lower classroom buildings, media center, and multipurpose room at Westlake Elementary School.

The extent of work includes but is not limited to:  demolition and removal of composition and membrane roofing, underlayment, flashing, gutters and downspouts; repair of roof sheathing, exterior wall finishes, roof drains, overflows, scuppers, vents, conduit, etc. and rigid insulation; installation of self-adhering membrane, required flashing. counter-flashing, curbs, caps, etc., gutters and downspouts connecting to existing storm drain, standing seam metal roofing system; Installation of 60 Mil single ply roofing system, required flashing. counter-flashing, curbs, caps, etc., overflows, scuppers, roof drains, downspouts, and gutters.

General Information

Contact Bartos Architecture for all project communications

Scope

Refer to project documents for detailed info

Westlake Elementary School Roof Replacement Project  |  Santa Cruz City Schools

 

Schedule

Architect

Bartos Architecture, Inc

1730 S. Amphlett Blvd, Suite 225

Tel: (650) 340-1221

• Bid Walk Sign- In Sheet

Project Announcements