© 2008 – 2022 | Bartos Architecture, Inc.
* col-lab-o-rate
verb \kə- ‘la-bə – ə -.rāt\intransitive verb
~to work jointly with others or together especially in an intellectual endeavor.
~to cooperate with an agency or instrumentality with which one is not immediately connected.
Collaboration
We collaborate with our clients, consultants and colleagues.
Advocacy
We advocate for the public, our clients, and the profession of Architecture.
Research
We research in support of design. We believe that the best designs are discovered.
Education
We educate our clients, the community, our profession, …and ourselves.
Sustainability
We make sustainability an integral a part of our practice.
• Santa Cruz City Schools Maintenance and Operations Page
• Bid Results - CRW Industries
• Bid Results - Guerra Construction
• Bid Results - Otto Construction
• Bid Results - Premier Builders
Mandatory Pre-Proposal Site Tour
Contractors must attend a mandatory site tour:
Tuesday, November 08, 2022 | 10:30 AM
Gault Elementary School
(at site address shown above)
Bid Question Deadline
Wednesday, November 16, 2022 | 5:00 PM
Addenda Deadline
Saturday, November 19, 2022
Proposals Due
Tuesday, November 22, 2022 | 11:00 AM
Bids Due at
Anticipated Contract Time
331 Days
Site Address
Gault Elementary School
1320 Seabright Avenue
Santa Cruz, CA 95062
District Address
Facilities Services
536 Palm Street
Santa Cruz, CA 95060
• Bid Drawing Set(Click if above link does not work)
• Project Manual-Division 00 and 01 documents to be posted after mandatory site walk
• Front Ends - Division 00 and 01
• DSA 103-19: Listing of Structural Tests & Special Instructions
Addenda
Downloadable Docs
The Project generally consists of removing existing portable buildings, site work, site utilities and utility connections --plumbing, mechanical, electrical, low voltage and fire alarm--necessary for the installation of a new, 2-story modular classroom building with a warming kitchen and multi-purpose room.
General Information
Contact Bartos Architecture for all project communications
Scope
Refer to project documents for detailed info
Gault Elementary School New Classroom Building| Santa Cruz City Schools
Schedule
Architect
Bartos Architecture, Inc
300 8th Ave Suite 202
San Mateo, CA, 94401
Tel: (650) 340-1221
Project Announcements