© 2008 – 2022  |  Bartos Architecture, Inc.

 

 

300 8th Avenue, Suite 202 | San Mateo, CA 94401 | 650-340-1221

* col-lab-o-rate

 

verb \kə- ‘la-bə – ə -.rāt\intransitive verb

~to work jointly with others or together especially in an intellectual endeavor.

~to cooperate with an agency or instrumentality with which one is not immediately connected.

PROGRAM AND CONSTRUCTION MANAGEMENT

Collaboration

We collaborate with our clients, consultants and colleagues.

Advocacy

We advocate for the public, our clients, and the profession of Architecture.

Research

We research in support of design. We believe that the best designs are discovered.

Education

We educate our clients, the community, our profession, …and ourselves.

Sustainability

We make sustainability an integral a part of our practice.

• Santa Cruz City Schools Maintenance and Operations Page

• Bid Walk Sign-in Sheet

 

• Preliminary Bid Results

• Bid Results - 101 Builders

• Bid Results - CRW Industries

• Bid Results - Guerra Construction

• Bid Results - Otto Construction

• Bid Results - Premier Builders

 

Project Bidding

 

Mandatory Pre-Proposal Site Tour

Contractors must attend a mandatory site tour:

 

Tuesday, November 08, 2022 | 10:30 AM

Gault Elementary School

(at site address shown above)

Bid Question Deadline

Wednesday, November 16, 2022 | 5:00 PM

 

Addenda Deadline

Saturday, November 19, 2022

 

Proposals Due

Tuesday, November 22, 2022 | 11:00 AM

Bids Due at

https://colbisecurebids.com

 

Anticipated Contract Time

331 Days

Site Address

Gault Elementary School

1320 Seabright  Avenue

Santa Cruz, CA 95062

 

District Address

Facilities Services

536 Palm Street

Santa Cruz, CA 95060

 

• Bid Advertisement

• Bid Drawing Set

• Bid Drawing Set(Click if above link does not work)

• Project Manual-Division 00 and 01 documents to be posted after mandatory site walk

• Front Ends - Division 00 and 01

• DSA 103-19: Listing of Structural Tests & Special Instructions

Addenda

• Addendum 1

• Addendum 2

• Addendum 2 - Existing MSB Photographs

Downloadable Docs

The Project generally consists of removing existing portable buildings, site work, site utilities and utility connections --plumbing, mechanical, electrical, low voltage and fire alarm--necessary for the installation of a new, 2-story modular classroom building with a warming kitchen and multi-purpose room.

General Information

Contact Bartos Architecture for all project communications

Scope

Refer to project documents for detailed info

Gault Elementary School New Classroom Building|  Santa Cruz City Schools

 

Schedule

Architect

Bartos Architecture, Inc

300 8th Ave Suite 202

San Mateo, CA, 94401

Tel: (650) 340-1221

Project Announcements