© 2008 – 2022 | Bartos Architecture, Inc.
* col-lab-o-rate
verb \kə- ‘la-bə – ə -.rāt\intransitive verb
~to work jointly with others or together especially in an intellectual endeavor.
~to cooperate with an agency or instrumentality with which one is not immediately connected.
Collaboration
We collaborate with our clients, consultants and colleagues.
Advocacy
We advocate for the public, our clients, and the profession of Architecture.
Research
We research in support of design. We believe that the best designs are discovered.
Education
We educate our clients, the community, our profession, …and ourselves.
Sustainability
We make sustainability an integral a part of our practice.
• Santa Cruz City Schools Maintenance and Operations Page
• Bid Results - CRW Industries
• Bid Results - Dilbeck & Sons
• Bid Results -Pionic Unit Construction
Previous Bid Results
• Bid Results - Dilbeck & Sons
Mandatory Pre-Proposal Site Tour
Contractors must attend a mandatory site tour:
Thursday, February 24, 2022 | 2:00 PM
Santa Cruz High School
(at site address shown above)
Bid Question Deadline
Friday, March 4, 2022 | 5:00 PM
Friday, March 18, 2022 | 5:00 PM
Addenda Deadline
Monday, March 7, 2022
Monday, March 21, 2022
Proposals Due
Thursday, March 10, 2022 | 1:00 PM
Thursday, March 24, 2022 | 1:00 PM
Bids Due at Facilities
536 Palm Street, Santa Cruz, CA, 95060
Anticipated Construction Schedule
April 11, 2022 - July 21, 2023
April 25, 2022- December 1, 2023
Site Address
Santa Cruz High School
415 Walnut Avenue
Santa Cruz, CA 95060
District Address
Facilities Services
536 Palm Street
Santa Cruz, CA 95060
• Bid Drawing Set(Click if above link does not work)
• Project Manual-Technical Specifications
Addenda
• Addendum 3RE Posted 12:59 pm, 3/21/2022
• Addendum 4RE Not substantial, clarification only
Downloadable Docs
The extent of work includes but is not limited to: modernizing an existing building with classroom, cafeteria and kitchen facilities at Santa Cruz High School.
General Information
Contact Bartos Architecture for all project communications
Scope
Refer to project documents for detailed info
Santa Cruz High School Modernization of Building C and D| Santa Cruz City Schools
Schedule
Architect
Bartos Architecture, Inc
1730 S. Amphlett Blvd, Suite 225
Tel: (650) 340-1221