© 2008 – 2022  |  Bartos Architecture, Inc.

 

 

300 8th Avenue, Suite 202 | San Mateo, CA 94401 | 650-340-1221

* col-lab-o-rate

 

verb \kə- ‘la-bə – ə -.rāt\intransitive verb

~to work jointly with others or together especially in an intellectual endeavor.

~to cooperate with an agency or instrumentality with which one is not immediately connected.

PROGRAM AND CONSTRUCTION MANAGEMENT

Collaboration

We collaborate with our clients, consultants and colleagues.

Advocacy

We advocate for the public, our clients, and the profession of Architecture.

Research

We research in support of design. We believe that the best designs are discovered.

Education

We educate our clients, the community, our profession, …and ourselves.

Sustainability

We make sustainability an integral a part of our practice.

• Santa Cruz City Schools Maintenance and Operations Page

• Bid Walk Sign-in Sheet

• Preliminary Bid Results

• Bid Results - Cen-Con

• Bid Results - CRW Industries

• Bid Results - Dilbeck & Sons

• Bid Results -Pionic Unit Construction

Previous Bid Results

• Preliminary Bid Results

• Bid Results - Dilbeck & Sons

• Bid Results - Cen-Con

• Bid Results - S&H Construction

• Bid Results - CRW Industries

Project Bidding

 

Mandatory Pre-Proposal Site Tour

Contractors must attend a mandatory site tour:

 

Thursday, February 24, 2022 | 2:00 PM

Santa Cruz High School

(at site address shown above)

Bid Question Deadline

Friday, March 4, 2022 | 5:00 PM

Friday, March 18, 2022 | 5:00 PM

 

Addenda Deadline

Monday, March 7, 2022

Monday, March 21, 2022

 

Proposals Due

Thursday, March 10, 2022 | 1:00 PM

Thursday, March 24, 2022 | 1:00 PM

Bids Due at Facilities

536 Palm Street, Santa Cruz, CA, 95060

 

Anticipated Construction Schedule

April 11, 2022 - July 21, 2023

April 25, 2022- December 1, 2023

Site Address

Santa Cruz High School

415 Walnut Avenue

Santa Cruz, CA 95060

 

District Address

Facilities Services

536 Palm Street

Santa Cruz, CA 95060

 

• Bid Advertisement

• Bid Drawing Set

• Bid Drawing Set(Click if above link does not work)

• Project Manual-Front Ends

• Project Manual-Technical Specifications

• Project Manual-Appendices

Addenda

• Addendum 1

• Addendum 2RE

• Addendum 3RE Posted 12:59 pm, 3/21/2022

• Addendum 4RE Not substantial, clarification only

Downloadable Docs

The extent of work includes but is not limited to: modernizing an existing building with classroom, cafeteria and kitchen facilities at Santa Cruz High School.

General Information

Contact Bartos Architecture for all project communications

Scope

Refer to project documents for detailed info

Santa Cruz High School Modernization of Building C and D|  Santa Cruz City Schools

 

Schedule

Architect

Bartos Architecture, Inc

1730 S. Amphlett Blvd, Suite 225

Tel: (650) 340-1221

Project Announcements

______________________

__________________

_______________

___________________