© 2008 – 2022 | Bartos Architecture, Inc.
* col-lab-o-rate
verb \kə- ‘la-bə – ə -.rāt\intransitive verb
~to work jointly with others or together especially in an intellectual endeavor.
~to cooperate with an agency or instrumentality with which one is not immediately connected.
Collaboration
We collaborate with our clients, consultants and colleagues.
Advocacy
We advocate for the public, our clients, and the profession of Architecture.
Research
We research in support of design. We believe that the best designs are discovered.
Education
We educate our clients, the community, our profession, …and ourselves.
Sustainability
We make sustainability an integral a part of our practice.
• Santa Cruz City Schools Maintenance and Operations Page
• Bid Results - S&H Construction
• Bid Results - Satellite Painting
• Bid Results - Fresh Start Painting Company
• Bid Results - GDL Painters, Inc.
Mandatory Pre-Proposal Site Tour
Contractors must attend a mandatory site tour:
Tuesday, March 9, 2021 | 10:00 AM
Westlake Elementary School
(at site address shown above)
Bid Question Deadline
Thursday, March 18, 2021 | 10:00AM
Addenda Deadline
Monday, March 22, 2021 | 10:00AM
Proposals Due
Thursday, March 25, 2021|11:30 AM
Bids Due at Facilities
536 Palm Street, Santa Cruz
Anticipated Construction Schedule
May 3, 2021- July 23, 2021
Site Address
Westlake Elementary School
1000 High Street
Santa Cruz, CA 95060
District Address
Facilities Services
536 Palm Street
Santa Cruz, CA 95060
Downloadable Docs
The extent of work includes but is not limited to: Exterior Painting at Westlake Elementary School
General Information
Contact Bartos Architecture for all project communications
Scope
Refer to project documents for detailed info
Westlake Elementary School Exterior Painting Project | Santa Cruz City Schools
Schedule
Architect
Bartos Architecture, Inc
1730 S. Amphlett Blvd, Suite 225
Tel: (650) 340-1221
Project Announcements